top of page
reference.png
Conica pozadí.png

OUR REFERENCE

Conica cz

We believe that a satisfied customer is the basis of success and a clear proof of quality services.

That is why we focus on an individual approach and solutions tailored to each customer.

Reliability and maximum professional approach are our priorities.

In almost 11 years of operation, we have experienced almost every project surprise and unconventional requirements within the framework of a technical solution. Thanks to this, we have the opportunity to cooperate with a diverse portfolio of customers from large, medium and small companies.

Together with our partners, we implement countless interesting projects in various fields and professions.

We are proud to be a part of these magnificent projects and we are ready for more.

10018_vlajka-svycarsko-90x150cm-c-41_edited.png
Conica cz
sabroli_chem
Pavel Sádlo.png

CEO, CSO

New ŠKODA Auto paint shop - Mladá Boleslav

The Škoda car company has opened a new paint shop at its main plant in Mladá Boleslav, which should be able to paint up to 168,000 cars a year. The total painting capacity of the car company will thus increase to 812,000 vehicles per year, which should contribute to shortening waiting times for new Škoda cars. The new building of the paint shop, which required an investment of 214.5 million euros, measures 276 meters in length, from 60 to 140 meters in width and 35 meters in height. Inside, we find a total of 7 floors - 3 main concrete floors and 4 metal mezzanine floors. The floor area is 25,094 square meters, which is roughly three football fields. The gross volume of the building is 828,058 cubic meters, which is about 265 Olympic swimming pools. The building was unofficially launched already in October 2017, when excavation work began. The foundation stone was laid in December of the same year, technology installation began in June 2018, the approval process began in January 2019, and the first car was painted here on June 3, 2019. Painting has actually been going on for a few months already, but the numbers are constantly increasing. While in the first weeks it was units of pieces per day, today production is around 200 vehicles per day. By the end of the first quarter of 2020, however, production should be at full speed, which means painting around 700 cars a day! The new paint shop is equipped with a number of new technologies as well as a high degree of automation.

Retention reservoir Vinice - Pilsen

Construction of a large retention tank on the Vinice housing estate for approximately 130 million crowns. It is a retention tank, which is primarily intended to prevent untreated water from the sewers from entering the river during torrential rains. The underground structure has a volume of six thousand cubic meters and was completed in 2022 in a joint effort with the STRABAG company.

Reconstruction of the National Museum - Prague

National Museum_edited.jpg

We were part of the general reconstruction of the historical building of the NATIONAL MUSEUM.

Reconstruction of Loděnice - Dukla Prague

15_edited.jpg

The training center for professional athletes, canoeists and rowers from Dukla, who form the core of the Czech Republic's national team, contains facilities for all-day multi-phase training on land and on water. The building includes: gym, exercise room, massage room with regeneration, hydromassage and sauna, athletes' locker rooms, trainers' facilities, rest rooms, study room, operational facilities, dining room and boat storage. Up to a hundred athletes are in various stages of training in the shipyard every day.

Paint shop - EvoBus Holýšov - Mercedes - Benz

4461110_.jpg

The expansion of the production plant included the construction of several structurally different buildings, forming a complex connected to the existing plant buildings.
Buildings SO40 (welding shop) and SO50 (painting shop) form one two-story mass indoor unit.
Object SO20 (body assembly) consists of the reconstruction and completion of the existing production hall, including sheds, and is structurally and operationally connected to the object of the paint shop.
Building SO31 (administrative and social facilities for employees) is a new three-story building.
The buildings are heated by gas boilers and air conditioning units with gas heating.
The engine room of the SHZ together with the above-ground steel fire tank of the KOHIMEX type form a separate object PS10.
Area roads, including a parking lot with 312 parking spaces, were also part of the implementation.
The construction took place while the plant was in full operation.

City Campus of the University of Ostrava

OU_VaclavCajka_KSLPvecer-scaled.jpg

A billion-dollar investment from European Union funds in the form of two buildings: 

University Sports and Behavioral Health Facilities and the Art and Design Cluster.

The new city campus is another step that will move Ostrava among the leading European student cities and retain young people in the region. 

New coaches, teachers, production workers, graphic designers and musicians will be educated on the campus.

For students, the City Campus will open state-of-the-art digital graphics workplaces, music studios with excellent acoustics, and modern sports facilities and diagnostic laboratories, including an indoor running oval.

The world of sports and art here connects a lively space with a wide residential staircase between the two buildings. 

You can look forward to sports, cultural and popularization events that will be held here regularly.

City Campus is open to the public, you can go to an exhibition, concerts, play sports or just walk on the roof of the sports building with a view of the Ostrava skyline.

TRAM DEPOT Hloubětín - Prague

Vizualizace_vozovny_Hloubetin-fasada_jih_autor_Metroprojekt-1701075535.jpg

The subject of the event is the demolition of the current storage hall of the depot and its statically connected outbuildings and the subsequent construction of a new depot. The existing hall of the sub-level lathe and the hall of daily treatment - dishwashers will be preserved, as these objects are not statically connected to the part of the building in a state of emergency. The entire scope of the construction takes place in the existing fenced area of the tram depot in Hloubětín. The new building is divided into four stages.

Solar Turbines - Blizzard Beggar - Caterpillar Company

19211-scaled.jpg

A high-tech repair center was built in the industrial zone of Žebrák. A state-of-the-art gas turbine test center.This new 14,400 m² facility focuses on product assembly and testing.

Jan Kašpar Pardubice Airport Terminal

terminal-letiste-pardubice-2018-27_denik-630-16x9.jpg

Between the beginning of 2016 and the autumn of 2017, the construction of the new Jan Kašpar terminal with a larger capacity took place. The construction cost was 256 million CZK, the investors are the Pardubice Region (34%) and the city of Pardubice (66%).
The first check-in passengers flew to Stansted, England, on January 30, 2018.

Park on Moravské náměstí in Brno

Moravske-namesti_1misto-02.jpg.webp

We were part of the revitalization of the public park on Moravian Square in Brno.

Reconstruction of Building A in BB Centrum

178098315-2650308698361763-3791220468866875392-o-860-9999-0-b2cc09-2.jpg

The sensitive and effective renovation of the interior and exterior of the office building Building A in the BB Center in Prague 4 won the first prize in the prestigious real estate competition CIJ Awards 2019 Czech Republic in the Best Commercial Reconstruction category. Building A was built in 2002, underwent complete reconstruction in 2018 and became the new headquarters of one of the leading Czech banks, MONETA Money Bank. The CIJ Awards Czech Republic 2019 award ceremony took place on November 28 in Slovanské dům. Building Building A was in continuous operation for 16 years.

KIKA - Nové Butovice

Galerie-Butovice-vizualizace-2.jpg

Complete implementation of synthetic screeds and garage systems.

Residence Hadovita - Michle

4-had-cam-07-final.jpg

New apartments in Rezidenc Hadovitá are being built in the Prague 4 – Michle district. The eight-story residence consists of five above-ground floors and three underground floors and has a total of 76 apartments and studios. All apartments in this project have either a front garden, balcony, loggia or terrace. Garage spaces are available in the project on two basement floors. The residence stands on a sloping terrain, which was a real challenge for the Prague architects from Arx Studio.

BD PRAGUE MARINA - RECONSTRUCTION + RENOVATION OF GARAGES

d568b3f13d9881a1259e4132f16930f8.jpg

Implementation of complete rehabilitation and reconstruction of garage floors in Prague Marina apartment buildings.

Extension of the Matějovský warehouse in Semile

105254tn.jpg

The project includes the expansion of the existing building, which serves as a wholesale bed linen warehouse with administrative and business facilities.

The proposed extension consists of two parts. The first part, which is being implemented in the period 4/2017-11/2017, is the extension of the new hall. The layout of the proposed hall is primarily designed as a storage hall. Structurally, the hall is based on monolithic piles, it is further solved using monolithic retaining walls ("white tub") and a prefabricated system. Due to the placement of the hall in the terrain, only the facade facing the current hall is dominant, which will be made in a combination of a bricked facade with suspended stone cladding and a glazed aluminum facade shell. The second part is implemented in the period 4/2018-9/2018. The newly designed solution envisages the addition of two parts, the extension of the hall to include dispatches and the extension of the showroom. The expansion of the hall is structurally solved with brick walls and pre-stressed ceiling panels. The dominant element is the flat roof, which connects to the current hall like an awning.

KOTELNA PARK - Prague

01_l_lis.jpg

We couldn't miss out on this unmissable project either.

Kotelna Park stands on the site of the former factory boiler room of the Walter, as industrial area with more than 100 years of history.

The Kotelna park area with its 120 m high chimney remains the dominant feature of the Radlický údolí.

The building is part of a vibrant and constantly developing new quarter, an office hub, around Radlická Street.

The private garden, located in a quiet area behind the building, invites you to work in the fresh air, as well as for relaxation or sports activities.

Cheb Hospital - Pavilion A and B

DSC_9350.JPG

In autumn 2019, the Karlovy Vary Region began the reconstruction and delivery of Pavilion B of the Chebská Hospital. It thus followed the construction of the new pavilion A, which was completed in 2018. Operations have already started in the new premises. The region paid more than three quarters of a billion crowns for the reconstruction of the hospital.

"Pavilion B has been renovated and extended. The left part of the reconstructed building is now used for specialized ambulances, an ENT clinic and an office for sonographic examinations. The central part is intended for the workplace and background of radiology. The inpatient departments of surgery, interns, gynecology and ENT are located in the pavilion. There are also eight so-called recovery beds, which are intended for patients after operations. They will serve for all operating rooms. This pavilion also houses a gynecological clinic and rehabilitation.

NEXEN Tires - Žatec

NEXEN-Tires.jpg

Construction of a tire production plant and a complete floor solution at both stages of construction.

Home for the elderly - Karlovy Vary

306202225_181273004464287_4682555097678048663_n.jpg

Construction of a home for the elderly, complete execution of floors.

Parking garage - Hotel Step

per-3841.jpg

Complete execution of screed parking systems.

SUOMI Hloubětín - YIT - 1st stage to 11th stage

YIT-Suomi-Hloubetin-1200x800.webp

Together with our VIP customer, we received their trust and have so far implemented from the 1st stage Espoo to the 11th stage on this magnificent project.
Suomi Hloubětín is an emerging residential district with Finnish-style houses in the cadastral area of Hloubětín in Prague 9 . It is located between Kolbenová street, the tram line next to the Hloubětín train station , the southern border is the Rokytka river . The development company YIT Česká republika, which entered the Czech market in 2008 when it acquired the Czech company Euro Stavokonsult, is building the district on the site of the original brownfield on an area of nine hectares for approximately 2,500 inhabitants. The name Suomi means Finland in Finnish .
Construction began in 2016, and will include approximately 900 or 1,000 apartments. Although the entire complex, including the park and its equipment, was supposed to be completed in 2023, due to the simultaneous construction of the Lappi Hloubětín project, completion is not planned until 2029. Initially, the construction was divided into 11 phases, but apartment buildings are still being added, which are named after Finnish cities. Later, an eleventh stage was added. The names of streets and public spaces, which refer to important Finnish personalities from the fields of culture, architecture and science, remind us of the Finnish character (e.g. Waltariho Street, Saarinen Street , Alvara Alta Square , Tove Jansson Park ). The district will have a wide range of civic amenities, in the central area in the ground floors of the houses there will be commercial spaces for shops and services, as well as a kindergarten with a large garden, on the slope above Rokytka there will be a restaurant, the advantage of which will be terraces with a view of the greenery. A natural amphitheater with a sports field and outdoor workout elements will be built near Rokytka. The complex is connected to a cycle path. There will be a dog park in the western part, and a community garden in the southeastern part. Access to the district is from Kolbenova Street (Prague) .

And many other projects...

Gemini_Generated_Image_b7mzcwb7mzcwb7mz_edited.png
  • Facebook
  • Instagram
  • Youtube

© SABROLI-CHEM s.r.o.

bottom of page